Nexus
Overview
Build log
Parts
Job cards
Service
Job cards.
20
% complete, 5 of 25 jobs.
Tuesday
5
/ 5
Transmission removal: remove electrical connectors
Remove the drive shaft rubber knuckle
Balance the trans, remove all 10 trans bolts (tarp required)
Rocker cover gasket removal: coils
Electrical connector (check if it needs a tool)
Tuesday 8th
0
/ 11
Go to Bunnings: extraction kit
(link)
Remove broken thread
Install baffle plate
Install oil pump
Oil pick up + new o ring
Oil pump chain on crank
Timing cover
Rear main seal
Timing guides
Setting the chain + zip tie up top
Oil pan installation
Friday night 11th
0
/ 3
Clean out head bolt threads
Head gasket installation
Put head on without torquing down
Tuesday 15th
0
/ 6
Torque head to block
Cam installation with timing kit
Vanos installation
Rocker cover
Clean valves
Water pump